Homeowner guide

How to Compare Remodeling Estimates

Normalize scope, allowances, exclusions, schedule, permits, cleanup, warranties, and payment terms before comparing totals.

Why this record matters

A bid total becomes useful only after each proposal covers the same work. Build a comparison sheet that shows where a price is fixed, allowed, excluded, or still unknown.

Checklist

  1. Use the same drawings, room list, and selection assumptions for every bid.
  2. Separate fixed-price work from allowances and unknown conditions.
  3. List demolition, protection, permits, trade work, disposal, patching, and cleanup.
  4. Identify owner-supplied products and responsibility for delivery, damage, and fit.
  5. Tie payments to defined milestones rather than dates alone.
  6. Require price and schedule changes to be written before changed work begins.

Questions the record should answer

  • Does each bid use the same drawing revision and selection list?
  • Which quantities, product grades, and site conditions are assumptions?
  • Who pays when an allowance is exceeded or a concealed condition is found?
  • Which required work appears in one proposal but not the others?

Official references

Requirements depend on the property, scope, jurisdiction, and current rules. Verify them directly before work begins.